Werribee Creek Timber Bridge Replacement

Werribee_Bridge_1.jpg

The project involves the design and construction a new concrete bridge to replace the existing timber bridge on Werribee Road, Canal Creek. The existing timber bridge has reached the end of its serviceable design life, with load restrictions put in place to ensure the structure remains safe until a new structure is built. 

Benefits

The new concrete bridge will replace the existing dilapidated structure and increase the mass limit to 47 tonne, reduce future maintenance requirements and improve safety of the structure.

Estimated cost

$600, 000

Commencement Date

January 2022

Duration

22 Months (extended due to wet weather)