Concurrence Assessments

The boundary setback requirements can be governed by the Planning Scheme or the Queensland Development Code, depending on the type of development:

Planning Scheme:
Boundary setbacks may be associated with the zone of the land. Where a boundary setback is stated under the Planning Scheme the Planning Scheme overrides the requirements of the Queensland Development Code. Refer to either the Planning Scheme or contact the Duty Planner. 

The Queensland Development Code:
Boundary setback requirements for Class 1 and 10 type structures are governed by this Code. Refer to Mandatory Part 1.1 (for lots under 450 square metres) or Mandatory Part 1.2 (for lots 450 square metres and over) of the Code. A summary sheet for these mandatory parts is here.